Investment maintenance of the school Milutin i Draginja Todorović

Project description

  • Object: School Milutin i Draginja Todorović
  • Address: St. Save Nemanjića No 2
  • At the Primary School, works were carried out to improve the schooling conditions and increase the quality of energy efficiency of the entire facility.
  • Type and description of works:
    • Replacement of old facade joinery and installation of new PVC and aluminum joinery;
    • Production of suspended ceilings under the roof panel in order to improve the energy efficiency of the building;
    • Installation of new LED lamps in classrooms;
    • Performing painting works in the building (painting of classrooms, hallways, teachers’ rooms, and toilets);
    • Construction of the facade on the old part of the school;
    • Repair and painting of concrete parts of the facade on the new part of the school;
    • Tinsmithing works (replacement of horizontal and vertical gutters, replacement of damaged sheet metal on the roof);
    • Production of new water supply and sewage installation in sanitary rooms;
    • Ceramic works in sanitary rooms and teachers’ rooms with the installation of new toilets;
    • Production of PVC floor in physics and chemistry classrooms;
    • Parquet works Repair, replacement, planing, grouting, and varnishing of parquet in classrooms.

Pronađite dom iz snova.

Počnimo