Grading - Izgradnja i adaptacija stambenih, poslovnih i industrijskih objekata

References


 

Project: Erdoglija, Kragujevac, Daničićeva and Kopaoničke str.

Construction is completed on 25.05.2014.

Investor:  Grading d.o.o
Status: Dobijena gradjevinska dozvola, izgradnja započeta 01.04.2013.
Purpose: Appartment Building
Rok završetka objekta 01.04.2014.
U toku je prodaja stanova po povoljnim cenama.
Informacije na tel: +381 65 8 272 656


 
 


 

Project: SPO Stepa Stepanović 4G

INVESTOR:  "BUILDING DIRECTORATE OF SRBIA"
Scope of works: Turnkey project

Designed object is located on the building plot GP 4, which is in the south- western part of the complex. Type of the building is business- residential, with the underground garage. It consists of three Sections with the same number of floors.
Objekat: Zeland Beograd
 

Project: Villa Ana

Investor: Private investor 
Scope of works: Turnkey project

Architectural solution has come as a result of the latest features of modern residential architecture in Belgrade, as well as by following The Investor's requests.

 

Project: Mačkov kamen

Investor: Private investor
Scope of works: Turnkey project

Residential building located in the elite Belgrade area - Dedinje, was taken in the "grey phase", i.e. with completed construction and according to The Investor's requirements, in addition to intervention in the interior, it is necessary to materialize the object to the highest standards in design and furnishing.

 

Project: Vila Dobrila

Investor: Private investor
Scope of works: Turnkey project

Residential building located in the elite Belgrade area - Dedinje, was taken in the "grey phase", i.e. with completed construction and according to The Investor's requirements, in addition to intervention in the interior, it is necessary to materialize the object to the highest standards in design and furnishing.

 

Project: Belville

Investor: BLOCK 67 ASSOCIATES Ltd.
Scope of Works: SPO 4/1 and 4/2 – Universiade 2009

Business- residential buildings SPO 4/1 and SPO 4/2 are the two of five business buildings which, with common underground garage G4, form the urbanistic whole on the building plot GP4.

In the architectural sense, in terms of materialization, architectural expression and scope, designer was lead by the idea of building complex that is modern and balanced, free of anything unnecessary, and which confirms the idea of simplicity through the future time.

This project was a challenge for the entire construction engineering industry of Serbia.

Objekat: Belville
 

Project: Tempo Čačak

Investor: Delta Construction Belgrade, 2008.
Scope of Works: Civil and Finishing Works, W&S, Road Communications and Electrical Installation Works.

Works on PCO Tempo in Čačak were executed during 2008. Building's construction is made of reinforced concrete casted in situ. Reinforced concrete columns dimensions 50x50 were made by using formwork system type Doka Frami, and for the slabs we were using formwork system Dokaflex 1-2-4. 

Thanks to good organization, working in two shifts and the  proper formwork sheme, the works on the construction were terminated even before dead-line. Finishing works, as well as the electrical works, were performed in accordance with the specific requirementss of technology of the building.

Tempo Čačak
 

Project: Zeland Belgrade

Investor:  Zeland Ltd.
Scope of works: turnkey project

Residential buildings A and B are situated within the complex 'Zeland' – the residential building complex located in exclusive area of Dedinje. Building C is located in Belgrade, 23 Neznanog junaka Street.
Buildings A and B are the gross area of cca 3 500m2, while the building C' gross area is cca 18 000 m2
Objekat: Zeland Beograd
 

Project: Roda Center

Investor: Private investor
Scope of works: Construction work

Named building represents the synthesis of all the activities and facilities operated by Grading: architectural designing and the performance of all the finishing works, engineering for the installation works, designing and furnishing of the interior in “turnkey” option.

 

Project: FIAT AUTOMOBILI SRBIJA - Trim Line - Assembly shop

Investor: Ciem Mada Serbia doo, Kneza Miloša 23, 34000 Kragujevac

Timeline: july 2011-octobar 2011

Object: Trim Line - Assembly shop

Brief description of work to be performed: construction work to build channels for installation of new production lines in the fabric FIAT SERBIA. In Kragujevac

Objekat: Belville
 

Project: Pig Farm "Delta Agrar"

Investor:  Delta Agrar
Object: Agro-industrial structure

Buildings for pig-fattening in Stara Pazova were built in the early seventies. They are situated on a location provided for agricultural activities close to the city.

 

Project: "Lesnina" ltd.

Investor:  LESNINA INŽENJERING ltd

The external appearance of buildings is in compliance with the ambiental whole of macro-environment. According to design, on the ground floor level are the entrances, access to the elevator and stairs. From garages exists a direct connection by the elevator and stairs with all the apartments on the floors

 

Project: Day Nursery "R. MILJKOVIĆ", DESPOTOVAC

Investor: Republic of Serbia - Ministry of the enviroment, mining and spatial planning and minucipalities Despotovac
Scope of works: turnkey project

The planned facility is GF +1. Construction of the building began a few years ago by another contractor, but after some time has stopped. During that period he built part of the structure.
Objekat: Zeland Beograd
 

Project: Deva, Kruševac

Investor: RK Deva Kruševac, 2006.
Scope of works: turnkey project

The reinforced concrete building structure of the Department store Deva in Krusevac was damaged by fire and after two previous unsuccessful attempts of building reconstruction, the Investor assigned the work to Grading in 2006. The construction reparatory works and building reconstruction design was made by design firm Centoprojekt from Belgrade.

Reparation of the reinforced concrete floor slabs was done by using the external carbon fiber technology. After reconstruction, the building got 1200m2 of warehouse space and approximately 2500m2 of sales area, with total of 10 stores and Maxi discount store at ground level and Tehnomarket store on the floor.

 

Project: MAIN POSTAL CENTER NIS

INVESTOR:  JP PTT SAOBRAĆAJA-SERBIA

PLC (GPC) Nis is located in an industrial area, on the edge of the urban residential zone of Nis, in Dimitrija Tucovića bb st., and makes it a land area of 0.52 ha, elongated shape. The terrain is gently rolling with elevations to 199 m.
The location borders in the north and east by the main railway station Niš (from the north of the platforms and tracks, and from the east by building), the South Dimitrija Tucovića bb st, and to the west by the business - technical facilities (warehouse) of other companies.
The site is located about 2 km from the heart of the city center of Nis, a 5 km to the highway E 75 Subotica - Nis - Belgrade.
 

Project: Savina Herceg Novi

Investor: Private investor
Scope of works: turnkey project

Named building represents the synthesis of all the activities and facilities operated by Grading: architectural designing and the performance of all the finishing works, engineering for the installation works, designing and furnishing of the interior in “turnkey” option.

 

Project: Maxi

Investor: Delta Maxi doo, Belgrade

Reconstruction of the Maxi retail market includes finishing work on the interior and exterior of buildings, as well as plumbing and elecrtical instalations.

Objekat: Belville
 
 


Complete reference list:
Apartment buildings | Residential apartment buildings | Business buildings | Production and industrial objects